Sections
You are here: Home Services Erection Full ensure of laying of cable and piping systems by trenchless method – ploughing
Document Actions

Full ensure of laying of cable and piping systems by trenchless method – ploughing

Picture1 

 

-          ensure the project

-          full cable and pipeline logistics

-          plowed cables and pipes up to a diameter of 500 mm

-          maximum laying depth 2.25 m

-          laying up to 40 cable and tubular elements in one work step

-          ability to perform plough-under via the rivers (maximum water depth 1,5 m,  with the laying of 1.3 m under the river basin)

-          SW analysis of laying in the real time, el. record of data of place of laying

-          Plough-under ability to perform up to grade soil 6 (light rock)

-          performance of laying, environment-friendliness

-          For demanding cable lines significant financial and time savings

 

For ploughing of cables lines is used ploughing-under plows from Walter Föckersperger GmbH Company (Germany) www.foeck.com, which delivers machines to the organizations dealing with laying of the cables lines (e.g. IFK GesmbH u. Co KG Company (Austria), www.verlegepflug.at , www.ifk.at ).

 

 

If you are interested in more information, please send us e-mail:info@zpaindustry.cz


Personal tools