Renewable Resources

References

 

Customer
Project
Services
Services
EUROCOOP INSPEKTA Inc.
PVPP Dubňany (3,15MW)
turnkey (addition to the supply and installation of panels)
2010
ČEZ Obnovitelné zdroje, Ltd.
WPP Věžnice
Project
2009
ELDACO Inc.
PVPP Vranovská Ves I, II, III
External cabling
2009
Energie Ltd.
WPP Bílčíce 18MW)
External cabling
2008-09
Aqua Projekt CZ Ltd.
WPP Chvalovice (2,5MW)
External cabling
2008
Aqua Projekt CZ Ltd.
WPP Mackovice (35MW)
Internal cabling, ext.cabling, switchroom 22/110kV
2007-09
VV3 Ltd.
WPP Odry - Veselí (2x2MW)
Internal cabling, ext. cabling, switching station
2006
WPP= wind power plant

 PVPP = photovoltaic power plant

Project Description

The company handles the entire documentation of electro part (internal cable management from a single power switching station or switching 22/110kV proposal 22kV switching station or switching 22/110kV, external cable lines in the case of grid points) for wind projects, parks and photovoltaic power plants and from design solutions through the documentation for the land and building management, the implementation and documentation of the supplier selection procedures for construction.
Our offer is not processing EIA study Connectivity (for Czech Republic processing the EGC) and property consultation (consent of the owner of the land, the lease, easements, removal of the ZPF and property for the performance function of the forest).

 

 

Description of the technology used for laying cables

For cable executives suggest (where possible) use of technology excavationless laying the pluhováním. In 2008 we established cooperation with IFKGmbH from Austria, which carries out the implementation of already 20 years old and has the most modern facilities.
This technology allows for lying of cable lines up to 110kV with no more interference with the landscape.

 

Basic technical data:

- Plowed cables and pipes up to a diameter of 500 mm
- Laying a maximum depth 2.25 m
- Laying up to 40 cable and pipe elements
    in one work step
- Storing until the soil class 6 (light rock)
- storingover rivers (max.depht of water 1.5 m;
    with the laying of 1.3 m under the river basin)
- SW analysis of laying in real time
- El. record of data location (documentation)
- Laying of high performance, environment-friendliness

 

 