Heating Plants
References
|
Customer
|
Project
|
Services
|
Date
|
|
|
Prague HP
|
Service and regular maintenance - holding a permanent emergency services
|
FI, SW, HW
|
2005-10
|
|
|
SAPELI, a.s.
|
Press heating control
|
Assembly work, project,SW, documentation,
|
2007
|
|
|
SAPELI, a.s.
|
Heating – new expedition
|
Assembly work, project,SW, documentation, revision
|
2007
|
|
|
Prague HP
|
Repair of electric stop valves installation on draught
|
Assembly work, project, SW, documentation
|
2007
|
|
|
Prague HP
|
Repairing of NTO armatures affiliating
|
Assembly work, fire barriess, revision
|
2006
|
|
|
Prague HP
|
LO 2006 – repairing of tractions
|
Assembly work, HW, SW, revisions
|
2006
|
|
|
Malesice HP
|
Control System upgrade for TMA2,3
|
turnkey
|
2006
|
|
|
Prague HP -
|
HW Expansion of control sys. boilers K11,12
|
D M&R EL,AS,DL, DAS,SW,CMM
|
2005
|
|
|
Prague HP
|
Reconstruction of measur. O2 boilers K11,12
|
DL,AS,SW,CMM
|
2005
|
|
|
Prague HP
|
Resumption of analyzer technology
|
DL,AS,SW,CM,M
|
2005
|
|
|
Prague HP
|
Capital Repair TG 3
|
DL,AS,SW,CMM
|
2005
|
|
|
Prague HP
|
Explosion-stopping protection of mill K11,12
|
AS,MM,D,SW,com.
|
2005
|
|
|
Prague HP
|
Electroinstallationrepair to exchanged armatures- Capital repair TG 3 - Part II.
|
D,DL,MM,AS
|
2005
|
|
|
Prague HP
|
Electroinstallationrepair to exchanged armatures- Capital repair TG 3 - Part I.
|
D,AS,SW
|
2005
|
|
|
Prague HP
|
Capital repair TG 3
|
EL,M&R
|
2005
|
|
|
Prague HP
|
Introduction of armatures and meas. into CS
|
DL,MM,DAS,CMM
|
2004
|
|
|
Prague HP
|
Prepar. of fusion for chemical waterconverter
|
turnkey M&R,CS,EL
|
2004
|
|
|
Prague HP
|
Operator workplaces and upgrade of servers
|
SW,CMM
|
2004
|
|
|
Malesice HP
|
Plant Control System
|
PR,ER,EL,CS,SC
|
2001
|
|
|
Malesice HP
|
Backup Exchanger Reconstruction
|
D
|
2001
|
|
|
Malesice HP
|
Connection of CS to TMA I
|
PR, ER,CMM
|
2000
|
|
|
Prague HP
|
Reconstruction VS - Exchanger station Umel.St
|
D,PR,ER
|
2000
|
|
|
Prague HP
|
Reconstruction VS - Exchanger station Jesle K
|
D,PR,ER
|
2000
|
|
|
Prague HP
|
Reconstruction VS - Exchanger station Arab St.
|
D,PR,ER
|
2000
|
|
|
Prague HP
|
Reconstruction VS - Exchanger station Dobr.St.
|
D,PR,ER
|
2000
|
|
|
Prague HP
|
Reconstruction VS - Exchanger station Nem.St.
|
D,PR,ER
|
2000
|
|
|
Hora Sv.Kat.
|
HSP Hora Sv.Kateriny
|
PR,ER,CMM
|
2000
|
|
|
Pilsen HP
|
Fluidic Boiler K6
|
PR,ER,FI,CS
|
2000
|
|
|
Ostrov HP
|
Boiler
|
PR,ER,FI,CS
|
2000
|
|
|
Prague HP
|
Reconstruction VS - Exchanger station Jil.St.
|
D,PR,ER
|
2000
|
|
|
Cs.Budejovice
|
Production Unit Comm.System
|
turnkey CS
|
2000
|
|
|
Prague HP
|
Boiler Room Dedina
|
PR,ER,FI,CS,CMM
|
2000
|
|
|
Prague HP
|
Steam to Water Transfer Station
|
PR,ER,EL,FI,CS,CMM
|
2000
|
|
|
Pilsen HP
|
PS350
|
PR,ER
|
2000
|
|
|
Energocenter
|
Heating Plant Expansion - HVAC Control
|
turnkey FI,CS
|
1999
|
|
|
Velveta Van.
|
Y2K Transition
|
D,CMM
|
1999
|
|
|
Ces.Bud.HP
|
Reduction Station - Energy Measurement
|
turnkey
|
1999
|
|
|
Ces.Bud.HP
|
PC Network II.phase
|
turnkey
|
1999
|
|
|
Prague HP
|
Installation of FI
|
PR,ER
|
1999
|
|
|
Energocenter
|
Servos Revision
|
D,ER
|
1999
|
|
|
Prague HP
|
4 Exchanger Stations Overhaul
|
D,PR,ER,FI,CS
|
1999
|
|
|
Ces.Bud.HP
|
PC Network I.phase
|
turnkey
|
1999
|
|
|
Prague HP
|
3 Exchanger Stations Overhaul
|
turnkey FI,CS
|
1999
|
|
|
Ces.Bud.HP
|
Boiler K12 - Replacement of Burners
|
turnkey FI,CS
|
1998
|
|
|
Ces.Bud.HP
|
Boiler K12 - Process Control
|
turnkey FI,CS
|
1998
|
|
|
Velveta Van.
|
Control Room
|
PR,ER,CMM
|
1998
|
|
|
Tabor HP
|
Boiler Data Backup
|
PR,ER,CMM
|
1998
|
|
|
Tabor HP
|
Boiler K5 - Electrical and Control System
|
turnkey EL,FI,CS
|
1998
|
|
|
Tabor HP
|
Boiler K5 - Water Treatment Plant
|
turnkey FI,CS
|
1998
|
|
|
Tabor HP
|
Boiler K5 - Automation of Operation
|
turnkey FI,CS
|
1998
|
|
|
Sok.Uhelna
|
Exchanger Station VS1
|
turnkey FI,CS
|
1998
|
|
|
Sok.Uhelna
|
Piping turnkey
|
turnkey FI,CS
|
1997
|
|
|
Sok.Uhelna
|
Boiler K1 - Ljungstrom/Denox
|
turnkey FI,CS
|
1997
|
|
|
Sok.Uhelna
|
Boiler K1 - Electrical Separators
|
turnkey FI,CS
|
1997
|
|
|
Sok.Uhelna
|
Boiler K1 - Automatics for RM1124
|
turnkey FI,CS
|
1997
|
|
|
Tabor HP
|
Boiler K15,K16 Overhaul
|
turnkey FI,CS
|
1997
|
|
|
Sok.Uhelna
|
Boiler K3 - Electrical Separators
|
turnkey FI,CS
|
1997
|
|
|
Velvera Van.
|
Boiler K2 - Electrical Separators
|
turnkey FI,CS
|
1997
|
|
|
Ces.Bud.HP
|
Boiler K11,K12 - Control System Overhaul
|
turnkey FI,CS
|
1997
|
|
|
Sok.Uhelna
|
Switching Station R2,4
|
turnkey EL,FI,CS
|
1996
|
|
|
Sok.Uhelna
|
Electrical Power Feeders K3 - EN1-EN6
|
turnkey FI,CS
|
1996
|
|
|
Sok.Uhelna
|
Boiler K3, Rack RM223
|
turnkey FI,CS
|
1996
|
|
|
Sok.Uhelna
|
Boiler K2, Rack RM224
|
turnkey FI,CS
|
1996
|
|
|
Sok.Uhelna
|
Ljungstrom/Denox - Automation of Operation
|
turnkey FI,CS
|
1996
|
|
|
Chemopetrol
|
Heating Plant Reconstruction
|
turnkey FI,CS
|
1996
|
|
|
Sok.Uhelna
|
Boiler K5, Rack RM522
|
turnkey FI,CS
|
1996
|
|
|
Velveta Van.
|
Boiler K1 - Electrical Separator
|
turnkey FI,CS
|
1996
|
|
|
Sok.Uhelna
|
PPC and VS2 Connection
|
turnkey FI,CS
|
1996
|
|
|
Velveta Van.
|
Remote Control Room
|
turnkey
|
1996
|
|
|
Sok.Uhelna
|
Boiler K3 - Electrical Separator Switchboard
|
turnkey FI,CS
|
1996
|
|
|
Sok.Uhelna
|
Boiler K3 - Ljungstrom/Denox
|
turnkey FI,CS
|
1996
|
|
|
Sok.Uhelna
|
Switching Station
|
turnkey EL,FI,CS
|
1996
|
|
|
Sok.Uhelna
|
Boiler K3 - RM324
|
turnkey FI,CS
|
1996
|
|
|
Prague HP
|
Complex new station
|
AS,MM,CMM,FI
|
1995
|
|
|
Prachatice
|
Boiler K4 - I&C gas burners
|
turnkey ASCI
|
1995
|
|
|
Vimperk
|
Exchange station
|
turnkey
|
1995
|
|
|
Prachatice
|
Exchanger 4MW
|
turnkey
|
1995
|
|
|
Velveta Van.
|
Turbine - Monitoring and operating system
|
turnkey
|
1995
|
|
|
Ces.Bud.HP
|
Boiler K11,12 - Feeding valves
|
turnkey ASCI
|
1995
|
|
|
Ces.Bud.HP
|
Deicing tunnel
|
turnkey ASCI
|
1995
|
|
|
Ces.Bud.HP
|
Boiler K9 - Reconstruction of CS
|
turnkey ASCI
|
1995
|
|
|
Ces.Bud.HP
|
Complete reconstruction of CS-Boiler K9,10
|
turnkey ASCI
|
1994-5
|
|
|
Hora Sv.Kateř.
|
Enlarging of measuring route - HPS
|
AS,MM,CMM,FI
|
1994
|
|
|
Prague HP
|
Capital repair - Boiler K13,14
|
turnkey ASCI
|
1994
|
|
|
Hora Sv.Kateř.
|
Passing station of gas
|
AS,MM,CMM,FI
|
1994
|
|
|
Sok.Uhelna
|
Turbine TG1
|
turnkey ASCI
|
1994
|
|
|
Sok.Uhelna
|
Complete CS of exchange station
|
turnkey ASCI
|
1994
|
|
|
Malesice HP
|
Boiler and Turbine Control - B1-3,TG,K11-12
|
CS,SC
|
1998
|
|
|
Sok.Uhelna
|
Placing CS on K4
|
turnkey ASCI
|
1994
|
|
|
Sok.Uhelna
|
Capital repair of informative and monitoring sys. turnkey
|
turnkey ASCI
|
1994
|
|
|
Strakonice
|
Control and reg.system VA and data
|
turnkey ASCI
|
1993
|
|
|
Sok.Uhelna
|
Capital repair of informative and regulating sys
|
turnkey ASCI
|
1993
|
|
|
Ces.Bud.HP
|
I&C of exchanger
|
turnkey
|
1993
|
|
|
Ces.Bud.HP
|
Capital repair - Boiler K9,10
|
turnkey ASCI
|
1992-3
|
|
|
Pratur HP
|
Reconstruction Boiler room
|
DL,MM,AS,CMM
|
1992
|
|
|
Nachod HP
|
Boiler K4 - Regulation injection
|
turnkey ASCI
|
1992
|
|
|
Prague HP
|
Capital repair - Boiler K3,K4
|
turnkey ASCI
|
1992
|
|
Abbreviations used:
AS - Assembly
ASCI - Autom.systems for technol.process control (CS+field instrumentation)
build. - building part
CS - Control System
CMM - Commissioning
COM - Communication
D - Basic and/or Detailed Design
DL - Delivery
ER - Erection
EL - Electrical System
electro - Electro part HV,LV
el.HV - High voltage el.part
el.LV - Low voltage el.part
FI - Field Instrumentation
HV - HV Electrical Part
M - Manufacturing
MM - Mounting material
M&R - Measurment and regulation
PR - Procurement
SC - SCADA System
SW - User progr.SW
turnkey - Complete project