Total Reconstruction-EPOČ

Total reconstruction of electrical systems and control systems for five 200MW blocks.

     

Customer:                  CEZ

Location:                    Power plant Pocerady

 

Project description

ZPA Industry a. s., as the main contractor realized total reconstruction of electrical systems and control systems for five 200MW blocks. ZPA Industry a.s. provided project design, delivery, assembly, commissioning and maintenance.

 

We are especially proud of reconstruction of block No.4. This included complete replacement of electrical and control systems within three months! Block No.4 was switched off on February 10 and it was back in full operation by June 15. We used control system from General Electric Fanuc, including turbine control with General Electric Fanuc Series 90-30, Series 90-70. Cimplicity HMI was implemented for SCADA system.

 

Project summary

Total Cimplicity I/O points:                  58400 points

Cimplicity Viewers:                              26

Cimplicity Servers:                              14

Total System I/O points:                     32980 I/O points

Total switchboards, up to 6kV:            410 cabinets

Total high-voltage switchboards:       130 cabinets

GE Fanuc Series 90-30:                      247 systems

GE Fanuc Series 90-70:                      4 systems

 

IMPLEMENTATION OF GE FANUC CONTROL SYSTEM RESULTED IN FAILURE RATE

LOWERED BY 78%, THUS FUNDAMENTALY INCREASING PRODUCTION RELIABILITY.

 

Amount of regulated drives and regulation loops (per block)

- 100 drives in ON - OFF 380 mode or 220 VAC

- 25 drives in ON - OFF 6 kV mode

- 125 drives in ON - OFF mode

- 60 drives in manual control MAN 0 - 100 %

- 122 drives for AUT made for 65 driving loops

 

I/O count per one block

Digital Inputs

24VDC

1376x

 

240VAC

1464x

Digital Outputs

24VDC

664x

 

240VAC

824x

Analog Inputs

0/4-20 mA

852x

 

+-10V/mA

36x

 

Pt100

240x

 

Thermocouples

324x

 

Expander

16x

Technology description

Boiler

- Rated boiler output                                                              640 tonnes per hour

- Superheated steam ratings                                                 17,5 Mpa, 540°C

- Reheated steam ratings

units 2, 3, 4                                                                        4,02/3,765MPa,346/550°C

units 5, 6                                                                            343/540°C

- Feed water temperature                                                     250°C

- Boiler efficiency at rated output                                           86,5%

 

Turbine

- Rated capacity                                                                     200MW

- Rated parameters upstream of turbine                               16,2 MPa/535°C

- Rated par. upstream of medium-pressure casing                3,5 MPa/545°C

- Cooling water for condenser                                                           19500m3/hr at 20°C

 

Alternators

- Capacity                                                                              200 MW    235 MWA

- Voltage                                                                                15 kV

- Cos phi                                                                                0,85

- RPM                                                                                     3000    50 Hz

 

Dates of commissioning

Block 6,3-93

Block 2-95

Block 4-96 (realized within 3 months - block shut down on 10.2. 96 and was again in full service            by 13.5. 96 )

Block 5-98

Coal-loading automation-96

Cooling water pump stations automation 97

 

 