Classical Power Generation

References

 
Customer
Project
Services
Date
CZ,Pocerady
Service and regular maintenance - holding a permanent emergency services
FI, SW, HW
2003-10
CZ,Pocerady
New procedure of bolier for reducing CO and NOx B2,3,5,6
Turn-key" CS+SCADA+technolog.
2009-10
ČR,PE
The desulphurization in Plzeňské energetice
Turn-key
2009
CZ,Pocerady
Reconstruction of CS GE Fanuc B3
Turn-key
2008
CZ,Prunerov
Increasing the efficiency of boilers PG350 K3 and K6 in the EPRI
Turn-key
2008
CZ,Prunerov
Increasing the efficiency of boilers PG350 K3 and K6 in the EPRI
Turn-key
2008
CZ,Prunerov
Upgrade of visualization of Cimplicity HMI CS
SW, delivery, assembly work
2008
VV3, s.r.o.
Wind power plant 2x2 MW Odry – Veselí
Turn- key
2007
CZ,Pocerady
Direct speed operating CS Fanuc
Turn-key
2007
 CZ,ECK Kladno
Cabling of generators - Energetika Kladno
MP, MM, revis.
2006
CZ,Pocerady
Data transfer from gas EPC control system
turnkey
2006
CZ,Pocerady
Servomotor cabinets for B3,B5
turnkey
2006
CZ,Pocerady
Control System GE Fanuc modifications
turnkey
2006
CZ,Pocerady
Replacement of I.level condensate pumps B5
turnkey
2006
CZ,Pocerady
Replacement of pit condensate pumps
turnkey
2006
CZ,Pocerady
Control system upgrade GE Fanuc B4
turnkey
2006
CZ,Pocerady
IT security and plant-wide upgrade SCADA Cimplicity v.6.1, WINDOWS 2003 R2
turnkey
CS-SCADA
2006
CZ,Pocerady
Fire-stopping barriers of coaler bridges EPC
D,AS,SW
2005
CZ,Pocerady
Edits of control system Fanuc Pocerady power plant for conn.of control system
turnkey
2005
CZ,Pocerady
Terminals connection of power plant TELEPOC and Units control system
D,DL,SW
2005
CZ,Pocerady
Modernizing of common oil economy
turnkey
2005
CZ,Pocerady
Technical support by setting of burning K2,K4
SW
2004
Cz,Pocerady
Set-up of control sys.-Exchange of gen.breaker
turnkey
2004
CZ,Počerady
Delivery and instalation of archiving server UPV
DL,SW,HW
2004
CZ,Pocerady
Reconstruction of condensate pumps 2nd grade - unit 3 - M&R
turnkey
2004
CH,Shen Tou
Technical support and design
D,TP
2004
CZ,Pocerady
Reconstruction of regulation TG 200MW
turnkey CS,M&R
2003-04
CZ,Počerady
Repair of F&C system GE Fanuc
turnkey CS,FI,el.HV
2003
CZ,Pocerady
Exchange condensate pumps 2nd grade B4
turnkey CS
2003
CZ,Pocerady
Stabilization of operating of descuming-dedging
turnkey CS,FI,EL
2002
CZ,Pocerady
Boiler K5 startup racionalization
turnkey EL,FI,CS
2002
CZ,Pocerady
Central Control Room
D,PR,SC,CMM
2001
CZ,Pocerady
Chemical Water Treatment Unit 5&6
turnkey D,EL,CS
2001
CZ,Pocerady
Condensate pumps II.level, B6
SW,CS,CMM
2001
CZ,Pocerady
Boiler K6 startup racionalization
turnkey EL,FI,CS
2001
CZ,Pocerady
Central Control Room, B2-B6
turnkey EL,FI,CS
2001
CZ,Prunerov
Setting of Prosonic 867
ER
2000
CZ,Pocerady
Coal Defrosting Tunel revision
D,PR,SW
2000
CZ,Pocerady
Ventilator reconstruction
turnkey HV,FI,CS
2000
CZ,Pocerady
Coal Supply Machine reconstruction
turnkey EL,FI,CS,COM
2000
CZ,Prunerov
Slug Transport EPR1 exchange
SC,CMM
2000
CZ,Melnik
Electrical Measurement Unit 3-6
PR,EM,ER,CM
2000
CZ,Pocerady
Condensate pumps II.level, B5
turnkey FI,CS
2000
CZ,Pocerady
Remote Stoper Control, Dreging Station
turnkey CS
2000
CZ,Pocerady
Technology blocks overhaul, B3
turnkey FI,CS
2000
CZ,Prunerov
Sludge Bed USAK
turnkey FI
2000
CZ,Pocerady
Power Supply for Control Systems
turnkey EL,CS
2000
CZ,Prunerov
Y2K tests of Control Systems
PR,CMM
2000
CZ,Pocerady
Coal Supply - CS tuning on Storing Mach.B
turnkey CS
1999
CZ,Pocerady
Control Room B6 to Control Room B5
turnkey PR,EL
1999
CZ,Pocerady
Overall Technology Control B6 adjustment
turnkey EL,FI,CS
1999
CZ,Pocerady
Electrical Generator Protections overhaul
turnkey CS
1999
BIH,Ugljevik
Monitoring System on 300MW
turnkey EL,CS
1999
CZ,Pocerady
Reconstruction of 6kV Control Circuits, B6
turnkey EL,CS
1999
CZ,Pocerady
Operator Station Modernisation UNIX-WinNT
turnkey PR,CS,SC
1999
CZ,Pocerady
Modernisation of coal supply
turnkey EL,FI,CS
1998/99
CZ,Prunerov
Water Treatment System
turnkey EL,FI
1999
CZ,Pocerady
El.protections control&monitoring from BSIII.
turnkey
PR,ER,SC,CMM
1998
CZ,Pocerady
Complete reconstruction of Unit 5 - 200MW
turnkey EL,FI,CS,civil
1998
CZ,Prunerov
CWT - Raw and Filtered Water overhaul
turnkey HV, FI,CS
1998
CZ,Pocerady
Fuel Chainfeeder Control overhaul
turnkey EL,FI,CS
1998
CZ,Tisova
CWT - Neutralisation Station overhaul
turnkey FI,CS
1998
CZ,Pocerady
Plate Caps Control System overhaul
turnkey FI,CS
1998
CZ,Prunerov
Fly Ash Handling on EPRU I
PR,ER,CMM,EL
1998
CZ,Prunerov
Cooling Overvoltage Protection
turnkey EL
1998
CZ,Tisova
CWT - Waste Water Measurement
turnkey FI,CS
1998
CZ,Pocerady
Excavation Station
turnkey FI,CS
1998
CZ,Prunerov
Dust and Soot Collection on EPRU II
PR,ER,EL,CS
1998
CZ,Pocerady
Conveyor Bridge ZPD-200
PR,EL,CMM,COM
1998
CZ,Prunerov
Belt Transport of Coal Line A
turnkey FI
1997
CZ,Prunerov
Boiler K5 Denitrification
turnkey
FI,CS
1997
CZ,Tisova
Mixing Device ERICH II
turnkey FI,CS
1997
CZ,Tisova
RGO Unit 6, MODIN regulation compensation
turnkey FI
1997
CZ,Tisova
RGO Unit 6, Pressure Sensors
turnkey FI
1997
CZ,Tisova
RGO Unit 6, Gas Burners
turnkey FI
1997
CZ,Tisova
RGO Unit 6, Equipment DANOX
turnkey FI
1997
CZ,Tisova
RGO Unit 6, Control System
turnkey FI
1997
CZ,Tisova
CWT - Cleaner
turnkey EL,FI
1997
CZ,Tisova
Belt Trasport - Stabilizer
turnkey FI
1997
CZ,Pocerady
Stabilizer Production
turnkey CS,SC
1997
CZ,Pocerady
Pumping Station of Cooling Water
turnkey FI,CS
1997
CZ,Tusimice
Fly Ash Transport
turnkey CS
1997
CZ,Tisova
Electric Feeders Reconstruction II.
EL,CS
1997
CZ,Prunerov
Coaling II.Phase
turnkey FI
1997
CZ,Prunerov
Desulphurization of Units 1-4
turnkey FI,CS,SC
1997
CZ,Pocerady
Feeding Water Sampling
turnkey
FI,CS,SC
1996
CZ,Pocerady
Inner Coaling
turnkey
FI,CS,SC
1996
CZ,Prunerov
Desulphurization of Unit 5
SC
1996
CZ,Tisova
Electric Feeders Reconstruction I.
EL,CS
1996
CZ,Prunerov
Unit 3 Denitrifi cation
turnkey FI,CS
1996
CZ,Melnik
Unit 3,4 Overhaul
PR,ER,CM
1996
CZ,Melnik
I&C Reconstruction
PR
1996
CZ,Tusimice
Gathering Machine
turnkey PR,CS,SC
1996
CZ,Pocerady
Chain Fuel Feeders
turnkey CS,SC
1996
CZ,Pocerady
Continues Temperature Monitoring
turnkey FI,CS
1996
CZ,Pocerady
Complete Reconstruction of Block No.4
turnkey EL,FI,CS,civil
1996
CZ, Tisova
CWT - Sand Filtres and Cation Resin
FI
1996
CZ,Pocerady
Unit No.6 - CS of Reducing Station
turnkey CS,SC
1996
CZ,Prunerov
Unit No.4 - Denitrifi cation
turnkey FI,CS
1995
CZ,Prunerov
Unit No.6 - Denitrifi cation
turnkey FI,CS
1995
CZ,Prunerov
Desulphurization
turnkey FI,CS
1995
CZ,Melnik
Units No.5,6 - 2x120t/h
PR,ER,CMM
1995
CZ,Melnik
Complete New Exchanging Station
turnkey FI,CS
1995
CZ,Pocerady
Unit No.3 - CS of Reducing Station
turnkey PR,CS,SC
1995
CZ,Pocerady
Unit No.2 - 200MW Complete Overhaul
turnkey CS,SC
1995
CZ,Prunerov
CHWTP - CS for Demiline1,2
turnkey
1994
CZ,Prunerov
CHWTP - Adjustment of Condesate
turnkey
1994
CZ,Prunerov
CHWTP - CS for HPF 1-5, HPF 6-10
turnkey
1994
CZ, Tusimice
Boiler K23, K24 - BMS
turnkey
1994
CZ,Tisova
TG5 Turbine - Complete Overhaul
turnkey
1994
CZ,Pocerady
Boiler K4 - BMS
turnkey
1994
CZ,Pocerady
Unit No.3 - Complete Overhaul
turnkey EL,FI,CS,SC
1993
CZ,Pocerady
ZNKK - I&C Overhaul
turnkey
1993
CZ,Pocerady
Unit No.6 - Complete Overhaul
turnkey EL,FI,CS,SC
1993
CZ,Prunerov
CHWTP - CS of Regen.HCl,NaOH
turnkey
1992
CZ,Pocerady
Unit No.2 Injection Regulation
turnkey
1992
CZ,Pocerady
Unit No.5, Boiler PG640 - Level Regulation
turnkey
1992
CZ,Pocerady
Unit No.5, Boiler PG640 - Level Regulation
turnkey
1991
CH, Shen Tou
Unit 4x200MW
turnkey FI,CS,EL
1989
CU,Nuevitas
Unit 3x125MW
turnkey FI,CS
1988
EG,Kafr
Dawar Unit 110MW
turnkey
1988
VT, Da Hang
Da Hang Power Station
turnkey CS
1987
AR, Lujan
Unit 1x250MW, Lujan de Cuyo
turnkey FI,CS
1987
Albania
Hydro Power Korca 1x3MW
turnkey
1986
Barma Hydro
Power Tha Fon 3x6MW
turnkey
1986
Cambodia
Hydro Power Chak Angre 3x6MW
turnkey
1985
UAE Abu
Dhabi 2x150MW
turnkey FI,CS
1985
Syria Homs
4x64MW
turnkey FI,CS
1985
Peru Iguitos
2x10MW
turnkey FI,CS
1981
Peru Pucallpa
2x10MW
turnkey FI,CS
1981
Albania Fieri
1x60MW
turnkey FI,CS
1980
CZ,Pocerady
Units 4x200MW
turnkey FI,CS
1979
Brasil
Sotelca 2x125MW
turnkey FI,CS
1978
Bulgaria
Sofia 1x30MW
turnkey FI,CS
1978
Egypt
Beida Dyers 3x6MW
 
 
Hungary
Inota 2x125MW
turnkey FI,CS
1978
Romania
Doicesti 2x100MW
turnkey FI,CS
1978
Cuba
Nuevitas 3x64MW
turnkey FI,CS
1978
Egypt
Deshna 2x4,5MW
turnkey FI,CS
1977
Bulgaria
Plovdiv 1x30MW
turnkey FI,CS
1977
CZ,Detmarovic
Units 4x200MW
turnkey FI,CS
1976
Brasil
Port Alegre 3x8MW
turnkey FI,CS
1976
Cuba
Regla 1x64MW
turnkey FI,CS
1976
Cuba
Cuba Hector Pavone 1x33MW
turnkey FI,CS
1976
Denmark
Amager 1x125MW
turnkey FI,CS
1975
Romania
Ludus 5x100MW
turnkey FI,CS
1974
Pakistan
Guddu 2x110MW
turnkey FI,CS
1974
Algeria
Skikda 2x137MW
turnkey FI,CS
1974
CZ,Vojany
Units 6x120MW
turnkey FI,CS
1974
Argentina
Rio Turbio 2x110MW
turnkey FI,CS
1974
Brasil
Igarape 1x125MW
turnkey FI,CS
1974
Finland
Hanasaari 2x114MW
turnkey FI,CS
1974
India
Madras 1x110MW
turnkey FI,CS
1974
Bangladesh
Khulna 1x60MW
turnkey FI,CS
1973
Korea
Unggi 2x50MW
turnkey FI,CS
1972
Romania
Brazi 2x200MW
turnkey FI,CS
1972
 
 
 
Abbreviations used:

 

AS        - Assembly
ASCI    - Autom.systems for technol.process control (CS+field instrumentation)
build.   - building part
CS        - Control System
CMM     - Commissioning
COM     - Communication
D          - Basic and/or Detailed Design
DL        - Delivery
ER        - Erection
EL        - Electrical System
electro - Electro part HV,LV
el.HV    - High voltage el.part
el.LV    - Low voltage el.part
FI         - Field Instrumentation
HV        - HV Electrical Part
M         - Manufacturing
MM       - Mounting material
M&R     - Measurment and regulation
PR        - Procurement
SC        - SCADA System
SW       - User progr.SW
turnkey - Complete project