Classical Power Generation
References
|
Customer
|
Project
|
Services
|
Date
|
|
CZ,Pocerady
|
Service and regular maintenance - holding a permanent emergency services
|
FI, SW, HW
|
2003-10
|
|
CZ,Pocerady
|
New procedure of bolier for reducing CO and NOx B2,3,5,6
|
Turn-key" CS+SCADA+technolog.
|
2009-10
|
|
ČR,PE
|
The desulphurization in Plzeňské energetice
|
Turn-key
|
2009
|
|
CZ,Pocerady
|
Reconstruction of CS GE Fanuc B3
|
Turn-key
|
2008
|
|
CZ,Prunerov
|
Increasing the efficiency of boilers PG350 K3 and K6 in the EPRI
|
Turn-key
|
2008
|
|
CZ,Prunerov
|
Increasing the efficiency of boilers PG350 K3 and K6 in the EPRI
|
Turn-key
|
2008
|
|
CZ,Prunerov
|
Upgrade of visualization of Cimplicity HMI CS
|
SW, delivery, assembly work
|
2008
|
|
VV3, s.r.o.
|
Wind power plant 2x2 MW Odry – Veselí
|
Turn- key
|
2007
|
|
CZ,Pocerady
|
Direct speed operating CS Fanuc
|
Turn-key
|
2007
|
|
CZ,ECK Kladno
|
Cabling of generators - Energetika Kladno
|
MP, MM, revis.
|
2006
|
|
CZ,Pocerady
|
Data transfer from gas EPC control system
|
turnkey
|
2006
|
|
CZ,Pocerady
|
Servomotor cabinets for B3,B5
|
turnkey
|
2006
|
|
CZ,Pocerady
|
Control System GE Fanuc modifications
|
turnkey
|
2006
|
|
CZ,Pocerady
|
Replacement of I.level condensate pumps B5
|
turnkey
|
2006
|
|
CZ,Pocerady
|
Replacement of pit condensate pumps
|
turnkey
|
2006
|
|
CZ,Pocerady
|
Control system upgrade GE Fanuc B4
|
turnkey
|
2006
|
|
CZ,Pocerady
|
IT security and plant-wide upgrade SCADA Cimplicity v.6.1, WINDOWS 2003 R2
|
turnkey
CS-SCADA
|
2006
|
|
CZ,Pocerady
|
Fire-stopping barriers of coaler bridges EPC
|
D,AS,SW
|
2005
|
|
CZ,Pocerady
|
Edits of control system Fanuc Pocerady power plant for conn.of control system
|
turnkey
|
2005
|
|
CZ,Pocerady
|
Terminals connection of power plant TELEPOC and Units control system
|
D,DL,SW
|
2005
|
|
CZ,Pocerady
|
Modernizing of common oil economy
|
turnkey
|
2005
|
|
CZ,Pocerady
|
Technical support by setting of burning K2,K4
|
SW
|
2004
|
|
Cz,Pocerady
|
Set-up of control sys.-Exchange of gen.breaker
|
turnkey
|
2004
|
|
CZ,Počerady
|
Delivery and instalation of archiving server UPV
|
DL,SW,HW
|
2004
|
|
CZ,Pocerady
|
Reconstruction of condensate pumps 2nd grade - unit 3 - M&R
|
turnkey
|
2004
|
|
CH,Shen Tou
|
Technical support and design
|
D,TP
|
2004
|
|
CZ,Pocerady
|
Reconstruction of regulation TG 200MW
|
turnkey CS,M&R
|
2003-04
|
|
CZ,Počerady
|
Repair of F&C system GE Fanuc
|
turnkey CS,FI,el.HV
|
2003
|
|
CZ,Pocerady
|
Exchange condensate pumps 2nd grade B4
|
turnkey CS
|
2003
|
|
CZ,Pocerady
|
Stabilization of operating of descuming-dedging
|
turnkey CS,FI,EL
|
2002
|
|
CZ,Pocerady
|
Boiler K5 startup racionalization
|
turnkey EL,FI,CS
|
2002
|
|
CZ,Pocerady
|
Central Control Room
|
D,PR,SC,CMM
|
2001
|
|
CZ,Pocerady
|
Chemical Water Treatment Unit 5&6
|
turnkey D,EL,CS
|
2001
|
|
CZ,Pocerady
|
Condensate pumps II.level, B6
|
SW,CS,CMM
|
2001
|
|
CZ,Pocerady
|
Boiler K6 startup racionalization
|
turnkey EL,FI,CS
|
2001
|
|
CZ,Pocerady
|
Central Control Room, B2-B6
|
turnkey EL,FI,CS
|
2001
|
|
CZ,Prunerov
|
Setting of Prosonic 867
|
ER
|
2000
|
|
CZ,Pocerady
|
Coal Defrosting Tunel revision
|
D,PR,SW
|
2000
|
|
CZ,Pocerady
|
Ventilator reconstruction
|
turnkey HV,FI,CS
|
2000
|
|
CZ,Pocerady
|
Coal Supply Machine reconstruction
|
turnkey EL,FI,CS,COM
|
2000
|
|
CZ,Prunerov
|
Slug Transport EPR1 exchange
|
SC,CMM
|
2000
|
|
CZ,Melnik
|
Electrical Measurement Unit 3-6
|
PR,EM,ER,CM
|
2000
|
|
CZ,Pocerady
|
Condensate pumps II.level, B5
|
turnkey FI,CS
|
2000
|
|
CZ,Pocerady
|
Remote Stoper Control, Dreging Station
|
turnkey CS
|
2000
|
|
CZ,Pocerady
|
Technology blocks overhaul, B3
|
turnkey FI,CS
|
2000
|
|
CZ,Prunerov
|
Sludge Bed USAK
|
turnkey FI
|
2000
|
|
CZ,Pocerady
|
Power Supply for Control Systems
|
turnkey EL,CS
|
2000
|
|
CZ,Prunerov
|
Y2K tests of Control Systems
|
PR,CMM
|
2000
|
|
CZ,Pocerady
|
Coal Supply - CS tuning on Storing Mach.B
|
turnkey CS
|
1999
|
|
CZ,Pocerady
|
Control Room B6 to Control Room B5
|
turnkey PR,EL
|
1999
|
|
CZ,Pocerady
|
Overall Technology Control B6 adjustment
|
turnkey EL,FI,CS
|
1999
|
|
CZ,Pocerady
|
Electrical Generator Protections overhaul
|
turnkey CS
|
1999
|
|
BIH,Ugljevik
|
Monitoring System on 300MW
|
turnkey EL,CS
|
1999
|
|
CZ,Pocerady
|
Reconstruction of 6kV Control Circuits, B6
|
turnkey EL,CS
|
1999
|
|
CZ,Pocerady
|
Operator Station Modernisation UNIX-WinNT
|
turnkey PR,CS,SC
|
1999
|
|
CZ,Pocerady
|
Modernisation of coal supply
|
turnkey EL,FI,CS
|
1998/99
|
|
CZ,Prunerov
|
Water Treatment System
|
turnkey EL,FI
|
1999
|
|
CZ,Pocerady
|
El.protections control&monitoring from BSIII.
|
turnkey
PR,ER,SC,CMM
|
1998
|
|
CZ,Pocerady
|
Complete reconstruction of Unit 5 - 200MW
|
turnkey EL,FI,CS,civil
|
1998
|
|
CZ,Prunerov
|
CWT - Raw and Filtered Water overhaul
|
turnkey HV, FI,CS
|
1998
|
|
CZ,Pocerady
|
Fuel Chainfeeder Control overhaul
|
turnkey EL,FI,CS
|
1998
|
|
CZ,Tisova
|
CWT - Neutralisation Station overhaul
|
turnkey FI,CS
|
1998
|
|
CZ,Pocerady
|
Plate Caps Control System overhaul
|
turnkey FI,CS
|
1998
|
|
CZ,Prunerov
|
Fly Ash Handling on EPRU I
|
PR,ER,CMM,EL
|
1998
|
|
CZ,Prunerov
|
Cooling Overvoltage Protection
|
turnkey EL
|
1998
|
|
CZ,Tisova
|
CWT - Waste Water Measurement
|
turnkey FI,CS
|
1998
|
|
CZ,Pocerady
|
Excavation Station
|
turnkey FI,CS
|
1998
|
|
CZ,Prunerov
|
Dust and Soot Collection on EPRU II
|
PR,ER,EL,CS
|
1998
|
|
CZ,Pocerady
|
Conveyor Bridge ZPD-200
|
PR,EL,CMM,COM
|
1998
|
|
CZ,Prunerov
|
Belt Transport of Coal Line A
|
turnkey FI
|
1997
|
|
CZ,Prunerov
|
Boiler K5 Denitrification
|
turnkey
FI,CS
|
1997
|
|
CZ,Tisova
|
Mixing Device ERICH II
|
turnkey FI,CS
|
1997
|
|
CZ,Tisova
|
RGO Unit 6, MODIN regulation compensation
|
turnkey FI
|
1997
|
|
CZ,Tisova
|
RGO Unit 6, Pressure Sensors
|
turnkey FI
|
1997
|
|
CZ,Tisova
|
RGO Unit 6, Gas Burners
|
turnkey FI
|
1997
|
|
CZ,Tisova
|
RGO Unit 6, Equipment DANOX
|
turnkey FI
|
1997
|
|
CZ,Tisova
|
RGO Unit 6, Control System
|
turnkey FI
|
1997
|
|
CZ,Tisova
|
CWT - Cleaner
|
turnkey EL,FI
|
1997
|
|
CZ,Tisova
|
Belt Trasport - Stabilizer
|
turnkey FI
|
1997
|
|
CZ,Pocerady
|
Stabilizer Production
|
turnkey CS,SC
|
1997
|
|
CZ,Pocerady
|
Pumping Station of Cooling Water
|
turnkey FI,CS
|
1997
|
|
CZ,Tusimice
|
Fly Ash Transport
|
turnkey CS
|
1997
|
|
CZ,Tisova
|
Electric Feeders Reconstruction II.
|
EL,CS
|
1997
|
|
CZ,Prunerov
|
Coaling II.Phase
|
turnkey FI
|
1997
|
|
CZ,Prunerov
|
Desulphurization of Units 1-4
|
turnkey FI,CS,SC
|
1997
|
|
CZ,Pocerady
|
Feeding Water Sampling
|
turnkey
FI,CS,SC
|
1996
|
|
CZ,Pocerady
|
Inner Coaling
|
turnkey
FI,CS,SC
|
1996
|
|
CZ,Prunerov
|
Desulphurization of Unit 5
|
SC
|
1996
|
|
CZ,Tisova
|
Electric Feeders Reconstruction I.
|
EL,CS
|
1996
|
|
CZ,Prunerov
|
Unit 3 Denitrifi cation
|
turnkey FI,CS
|
1996
|
|
CZ,Melnik
|
Unit 3,4 Overhaul
|
PR,ER,CM
|
1996
|
|
CZ,Melnik
|
I&C Reconstruction
|
PR
|
1996
|
|
CZ,Tusimice
|
Gathering Machine
|
turnkey PR,CS,SC
|
1996
|
|
CZ,Pocerady
|
Chain Fuel Feeders
|
turnkey CS,SC
|
1996
|
|
CZ,Pocerady
|
Continues Temperature Monitoring
|
turnkey FI,CS
|
1996
|
|
CZ,Pocerady
|
Complete Reconstruction of Block No.4
|
turnkey EL,FI,CS,civil
|
1996
|
|
CZ, Tisova
|
CWT - Sand Filtres and Cation Resin
|
FI
|
1996
|
|
CZ,Pocerady
|
Unit No.6 - CS of Reducing Station
|
turnkey CS,SC
|
1996
|
|
CZ,Prunerov
|
Unit No.4 - Denitrifi cation
|
turnkey FI,CS
|
1995
|
|
CZ,Prunerov
|
Unit No.6 - Denitrifi cation
|
turnkey FI,CS
|
1995
|
|
CZ,Prunerov
|
Desulphurization
|
turnkey FI,CS
|
1995
|
|
CZ,Melnik
|
Units No.5,6 - 2x120t/h
|
PR,ER,CMM
|
1995
|
|
CZ,Melnik
|
Complete New Exchanging Station
|
turnkey FI,CS
|
1995
|
|
CZ,Pocerady
|
Unit No.3 - CS of Reducing Station
|
turnkey PR,CS,SC
|
1995
|
|
CZ,Pocerady
|
Unit No.2 - 200MW Complete Overhaul
|
turnkey CS,SC
|
1995
|
|
CZ,Prunerov
|
CHWTP - CS for Demiline1,2
|
turnkey
|
1994
|
|
CZ,Prunerov
|
CHWTP - Adjustment of Condesate
|
turnkey
|
1994
|
|
CZ,Prunerov
|
CHWTP - CS for HPF 1-5, HPF 6-10
|
turnkey
|
1994
|
|
CZ, Tusimice
|
Boiler K23, K24 - BMS
|
turnkey
|
1994
|
|
CZ,Tisova
|
TG5 Turbine - Complete Overhaul
|
turnkey
|
1994
|
|
CZ,Pocerady
|
Boiler K4 - BMS
|
turnkey
|
1994
|
|
CZ,Pocerady
|
Unit No.3 - Complete Overhaul
|
turnkey EL,FI,CS,SC
|
1993
|
|
CZ,Pocerady
|
ZNKK - I&C Overhaul
|
turnkey
|
1993
|
|
CZ,Pocerady
|
Unit No.6 - Complete Overhaul
|
turnkey EL,FI,CS,SC
|
1993
|
|
CZ,Prunerov
|
CHWTP - CS of Regen.HCl,NaOH
|
turnkey
|
1992
|
|
CZ,Pocerady
|
Unit No.2 Injection Regulation
|
turnkey
|
1992
|
|
CZ,Pocerady
|
Unit No.5, Boiler PG640 - Level Regulation
|
turnkey
|
1992
|
|
CZ,Pocerady
|
Unit No.5, Boiler PG640 - Level Regulation
|
turnkey
|
1991
|
|
CH, Shen Tou
|
Unit 4x200MW
|
turnkey FI,CS,EL
|
1989
|
|
CU,Nuevitas
|
Unit 3x125MW
|
turnkey FI,CS
|
1988
|
|
EG,Kafr
|
Dawar Unit 110MW
|
turnkey
|
1988
|
|
VT, Da Hang
|
Da Hang Power Station
|
turnkey CS
|
1987
|
|
AR, Lujan
|
Unit 1x250MW, Lujan de Cuyo
|
turnkey FI,CS
|
1987
|
|
Albania
|
Hydro Power Korca 1x3MW
|
turnkey
|
1986
|
|
Barma Hydro
|
Power Tha Fon 3x6MW
|
turnkey
|
1986
|
|
Cambodia
|
Hydro Power Chak Angre 3x6MW
|
turnkey
|
1985
|
|
UAE Abu
|
Dhabi 2x150MW
|
turnkey FI,CS
|
1985
|
|
Syria Homs
|
4x64MW
|
turnkey FI,CS
|
1985
|
|
Peru Iguitos
|
2x10MW
|
turnkey FI,CS
|
1981
|
|
Peru Pucallpa
|
2x10MW
|
turnkey FI,CS
|
1981
|
|
Albania Fieri
|
1x60MW
|
turnkey FI,CS
|
1980
|
|
CZ,Pocerady
|
Units 4x200MW
|
turnkey FI,CS
|
1979
|
|
Brasil
|
Sotelca 2x125MW
|
turnkey FI,CS
|
1978
|
|
Bulgaria
|
Sofia 1x30MW
|
turnkey FI,CS
|
1978
|
|
Egypt
|
Beida Dyers 3x6MW
|
|
|
|
Hungary
|
Inota 2x125MW
|
turnkey FI,CS
|
1978
|
|
Romania
|
Doicesti 2x100MW
|
turnkey FI,CS
|
1978
|
|
Cuba
|
Nuevitas 3x64MW
|
turnkey FI,CS
|
1978
|
|
Egypt
|
Deshna 2x4,5MW
|
turnkey FI,CS
|
1977
|
|
Bulgaria
|
Plovdiv 1x30MW
|
turnkey FI,CS
|
1977
|
|
CZ,Detmarovic
|
Units 4x200MW
|
turnkey FI,CS
|
1976
|
|
Brasil
|
Port Alegre 3x8MW
|
turnkey FI,CS
|
1976
|
|
Cuba
|
Regla 1x64MW
|
turnkey FI,CS
|
1976
|
|
Cuba
|
Cuba Hector Pavone 1x33MW
|
turnkey FI,CS
|
1976
|
|
Denmark
|
Amager 1x125MW
|
turnkey FI,CS
|
1975
|
|
Romania
|
Ludus 5x100MW
|
turnkey FI,CS
|
1974
|
|
Pakistan
|
Guddu 2x110MW
|
turnkey FI,CS
|
1974
|
|
Algeria
|
Skikda 2x137MW
|
turnkey FI,CS
|
1974
|
|
CZ,Vojany
|
Units 6x120MW
|
turnkey FI,CS
|
1974
|
|
Argentina
|
Rio Turbio 2x110MW
|
turnkey FI,CS
|
1974
|
|
Brasil
|
Igarape 1x125MW
|
turnkey FI,CS
|
1974
|
|
Finland
|
Hanasaari 2x114MW
|
turnkey FI,CS
|
1974
|
|
India
|
Madras 1x110MW
|
turnkey FI,CS
|
1974
|
|
Bangladesh
|
Khulna 1x60MW
|
turnkey FI,CS
|
1973
|
|
Korea
|
Unggi 2x50MW
|
turnkey FI,CS
|
1972
|
|
Romania
|
Brazi 2x200MW
|
turnkey FI,CS
|
1972
|
Abbreviations used:
AS - Assembly
ASCI - Autom.systems for technol.process control (CS+field instrumentation)
build. - building part
CS - Control System
CMM - Commissioning
COM - Communication
D - Basic and/or Detailed Design
DL - Delivery
ER - Erection
EL - Electrical System
electro - Electro part HV,LV
el.HV - High voltage el.part
el.LV - Low voltage el.part
FI - Field Instrumentation
HV - HV Electrical Part
M - Manufacturing
MM - Mounting material
M&R - Measurment and regulation
PR - Procurement
SC - SCADA System
SW - User progr.SW
turnkey - Complete project