Other Applications
References
|
Customer
|
Project
|
Services
|
Date
|
|
CS01 Velké Zlievce, SR
|
Optical network CS01 Velké Zlievce
|
Turn-key
|
2009
|
|
CS Veselí
|
Turbine diagnosis 6MW on CS Veselí
|
Turn-key
|
2009
|
|
NČV a.s.
|
Second evaporator NČV from Lille
|
Turn-key
|
2008
|
|
KS Hostim, KS Kralice
|
Turbo-set diagnostics – north side
|
Turn-key
|
2007
|
|
PZP Štramberk
PZP Háje
|
Diagnostic of turbosmachine PZP Háje and Štramberk
|
D,DL,AS,CMM
|
2006
|
|
KS Kralice
|
Reparing of cabling HKS
|
D,DL,AS - CS
|
2006
|
|
BaK Systémy
|
Switchgear production for BaK Systems
|
MP, revision
|
2006
|
|
FINLAY CZ
|
Delivery, Assembly and calibration on mobile sorting machine FINLAY 798
|
DL, AS, calibration
|
2005
|
|
Swedwood
|
Band-scale for weighing of medial layer
|
DL, AS, CMM, calibration, tests
|
2005
|
|
KS Břeclav
|
Diagnostic of turboaggregates
I. phase - TRABIS
|
CS, COM
optic
|
2005
|
|
Kouřim Kralice
|
Compressor stations 250W
|
turnkey , technol. Network
|
2003-4
|
|
DP Praha Metro
|
Technical assistance with assembly
|
AS - elektro
|
2003
|
|
Bosch Siemens
|
Prodiction hall-Elektroinstalation
|
AS - elektro
|
2002
|
|
Lantus
|
Inzulin production Lantus - HW design
|
D, I/O Remote module
|
2001
|
|
Basic School Ševětín
|
Temperature regulation in Basic School
|
DL, AS, D, CMM
|
2001
|
|
Fa Pörner Rakousko
|
Technology Disassembly LINZ
|
AS
|
2000
|
|
Spleric Technik
|
Heating Glass Works Chudeřice
|
MM, AS
|
2000
|
|
Málkov
|
Gass Connection DN 80
|
MM, AS
|
2000
|
|
LEANDER 1946
|
Forge temperature control repair to continuous control and temperature repair of Netzch semi-automatic machine
|
D, MP M&C
|
2000
|
|
Dobřichovice
|
Boiler room I&C
|
MM, CMM, field instr.
|
2000
|
|
Nejdek
|
Basic School -Erection of PC network
|
D,MM,MON,Naj.
|
2000
|
|
Severočeské Doly
|
Technology adjustment of warm utility water
|
turnkey, ASCI
|
1999
|
|
Glaverbel Czech Teplice
|
Distributor production and supply
|
DL
|
1999
|
|
Koramo Kolín
|
Replacement of oil regulation
|
turnkey, ASCI
|
1999
|
|
Heationg plant Felton
|
Manufacture and delivery of racks, delivery of instruments
|
DL
|
1999
|
|
ZPČ Plzeň
|
Change of the heating system
|
turnkey, ASCI
|
1998
|
|
Libouš II
|
Modernization of operation
|
turnkey, EL-LV
|
1997
|
|
Diamo TÚU
|
Reconstruction of switchgear 110/35kV
|
turnkey, ASCI
|
1997
|
|
Glasshouse ŘETENICE
|
Control system connecting
|
DL,MM,AS
|
1996
|
|
Telč
|
Modernization current system UPV
|
turnkey, ASCI
|
1996
|
|
SAKO Brno
|
Reconstruction of incinerator, adjustments on the boiler for lowering of emissions and improving of economic operation
|
turnkey
|
1996
|
|
Svitavy
|
Printing and manufacturing operation
|
complete field instr.
|
1995
|
|
Army objects VIMPERK
|
Reconstruction of boiler room
|
DL,MM,AS-field instr.
|
1994
|
Abbreviations used:
AS - Assembly
ASCI - Autom.systems for technol.process control (CS+field instrumentation)
build. - building part
CS - Control System
CMM - Commissioning
COM - Communication
D - Basic and/or Detailed Design
DL - Delivery
ER - Erection
EL - Electrical System
electro - Electro part HV,LV
el.HV - High voltage el.part
el.LV - Low voltage el.part
FI - Field Instrumentation
HV - HV Electrical Part
M - Manufacturing
MM - Mounting material
M&R - Measurment and regulation
PR - Procurement
SC - SCADA System
SW - User progr.SW
turnkey - Complete project