Chemical & Petrochemical

References

 

Customer
Project
Services
Services
Synthos KRALUPY, Inc.
Transport of fire alarm system to neutralization tank reactors
Project
2011
Synthos KRALUPY, Inc.
PBR - OFF SITE connection of butadiene pumps
DL, AS, MM, D, CMM
2011
Synthos KRALUPY, Inc.
Polybutadien Unit - documentation and engineering for the system of electric heating
D,DL, AS,R
2011
Synthos KRALUPY, Inc.
Installation of the filter for river water for Styrene
DL, AS, MM, D, CMM
2011
Al Taweelah, Abu Dhabi, Emirates Aluminium Company Limited
Software work in Abu Dhabi
SW
2011
Synthos KRALUPY, Inc.
Assessed indicators SSO
turnkey, electro M&R, producement, revision, D
2010
Synthos KRALUPY, Inc.
Replacement of turbo feed pump TN1
turnkey, D, Producemnet, erection, training, AS-build, Tests
2010
Synthos KRALUPY, Inc.
SW work according to XEPS Project
SW work, start up, commissioning
2010
Spolek pro chem. a hutní výrobu, Inc.
Modifying the power steering and regul. Systems - Liquid Chlorine
 
CS
2008
Spolek pro chem. a hutní výrobu, Inc.
Increasing of granary 23 TK D01
DL, AS
2008
Synthos KRALUPY, Inc.
Flow measurement still fluid ETB
DL, AS, revision
2008
Synthos KRALUPY, Inc.
Improving safety of SKP
DL, AS, revision
2008
Spolek pro chem. a hutní výrobu, Inc.
Recovery of production HCl
 
 
turnkey
 
2008
 
 
Synthos KRALUPY, Inc.
Analyzer of measurement of particle size ZPS
AS, revision, D
2008
Synthos KRALUPY, Inc.
General repair of the main motor switch board Rm 042.1 and RO 042.1
AS, revision, D
2007
Synthos KRALUPY, Inc.
Reconstruction of heat control room Z EN
AS, revision, D
2007
Synthos KRALUPY, Inc.
Delivery and installation of ASCI – part of series 100 and 600
AS, revision, D
2007
Spolek pro chem. a hutní výrobu, Inc.
NMEP II – PS 03
turnkey
2007
Spolek pro chem. a hutní výrobu, Inc.
Safety increasing of operation of chlorine chemistry – control system
turnkey
2007
Synthos KRALUPY, Inc.
Intensification to ZPS on 87 kt – oxygen detection for oasts
AS, revision, D
2007
Synthos KRALUPY, Inc.
Elements and switchboards exchange for operating VZT
AS, revision, D
2007
Synthos KRALUPY, Inc.
New manufacturing BTD II – outlet removal MK 101
AS, revision, D
2007

 Abbreviations used:

AS        - Assembly

ASCI    - Autom.systems for technol.process control (CS+field instrumentation)
build.   - building part
CS        - Control System
CMM     - Commissioning
COM     - Communication
D          - Basic and/or Detailed Design
DL        - Delivery
ER        - Erection
EL        - Electrical System
electro - Electro part HV,LV
el.HV    - High voltage el.part
el.LV    - Low voltage el.part
FI         - Field Instrumentation
HV        - HV Electrical Part
M         - Manufacturing
MM       - Mounting material
M&R     - Measurment and regulation
PR        - Procurement
SC        - SCADA System
SW       - User progr.SW
turnkey - Complete project

 

 