Chemopetrol-PolypropylenII
The complete instrumentation installation for 200.000 MTPA HDPE polyethylen plant
Client: Cegelec Sunvic E & I GmbH, Leipzig
Location: Chemopetrol Litvínov, CZ
Project description
ZPA executed the complete instrumentation installation for 200.000 MTPA HDPE polyethylen plant. This included installation of cable trays and ladders including supports, piping, junction boxes, protection boxes, cables and their connection, etc. Furthermore ZPA provided a complete supply of assembly material, production and supply of supports for instrumentation and cable trays.
In the light of supply and installation according to the Contract, also other assembly concerning the instrument installation was executed – valves, changes in piping for installation of remote fixtures, installation of wells and take-offs, installation and connection of panels. Furthermore functional tests and loop checks were executed.
Project summary
instrument installation (incl. nuclear sensors)
installation of cables and needed cable trays
installation of piping, junction boxes, protection boxes, etc.
production, supply and installation of all supports instrumentation, cable trays and
panels
supply of assembly material
mounting and connection of panels
connection of cables
functional tests and loop checks
asistence and de-bugging during commissioning
|
Erection work in figures |
|
|
Laying of cable trays and piping |
6070 m |
|
Laying of cable |
82000 m |
|
Instrument installation |
1020 pcs |
|
Functional tests and loop checks |
1550 pcs |
|
Production and installation of supports |
700 pcs |
|
Assembly and connection of piping |
260 pcs |
|
Connection of cables (incl. tests) |
1 190 pcs |
|
Mounting of accessories |
900 pcs |
|
Laying of cables in Control Room |
1 200 pcs |
|
Installation of panels |
50 pcs |
|
Assembly of junction boxes |
133 pcs |
|
Connection of cables (incl. tests) |
672 pcs |