Chemopetrol-Polypropylen I
The installation of instruments and control panels, lay-down of cables, wiring, installation of Gas detection system, instrument calibration and testing
Client: Foster Wheeler Italiana S.p.A.
Place: Chemopetrol Litvínov, CZ
Project description
ZPA provided it’s services for polypropylen PP2 250 000 MTA instruments works installation. ZPA executed installation of instruments and control panels, lay-down of cables, wiring, installation of Gas detection system, instrument calibration and testing. Scope of work also inluded supply of some materials (e.g. cable glands, supports, etc.) all consumables, tools and equipment for construction, installation and testing, skilled and unskilled labour, management nad supervision staff.
Furthermore the company supplied and installed complete electrical tracing system for the production unit. Besides testing that included 2358 loops, the commissioning of the works had been executed.
Year of commissioning:
January 2003