Customer
Project
Services
Date
Spolek pro chem. a hutní výrobu, a.s.
Service and regular maintenance - holding a permanent emergency services
FI, SW, HW
2007-10
Synthos KRALUPY, a.s.
Delivery, installation and commissioning of the EPS service for NI: Production XPS panels
Assembly,delivery MM and switchboard, documentation
2009
Synthos KRALUPY, a.s.
Increased security of SKP - Stage III of instrumentation
Assembly,delivery MM and switchboard, documentation
2009
Synthos KRALUPY, a.s.
Delivery, installation and commissioning of mearusements for NI: production XPS panels
Assembly,delivery MM and switchboard, documentation
2009
Synthos KRALUPY, a.s.
Supply and installation of electro PS0518, PS148, PS002 - Production XPS panels
Assembly,delivery MM and switchboard, documentation
2009
Spolek pro chem. a hutní výrobu, a.s.
Modifying the power steering and regul. Systems - Liquid Chlorine
 
CS
2008
Spolek pro chem. a hutní výrobu, a.s.
Increasing of granary 23 TK D01
Delivery, assembly work
2008
ČR,Kralupy
Flow measurement still fluid ETB
Delivery, assembly work, revision
2008
ČR,Kralupy
Improving safety of SKP
Delivery, assembly work, revision
2008
Spolek pro chem. a hutní výrobu, a.s.
Recovery of production HCl
 
 
Turn - key
 
 
2008
 
 
CZ,Kralupy
Analyzer of measurement of particle size ZPS
Assembly work, revision, documentation
2008
CZ,Kralupy
General repair of the main motor switch board Rm 042.1 and RO 042.1
Assembly work, revision, documentation
2007
CZ,Kralupy
Reconstruction of heat control room Z EN
Assembly work, revision, documentation
2007
CZ,Kralupy
Delivery and installation of ASCI – part of series 100 and 600
Assembly work, revision, documentation
2007
 
Epispol, a.s.
NMEP II – PS 03
Turn - key
2007
CZ, Spolek pro chemickou a hutní výrobu
Safety increasing of operation of chlorine chemistry – control system
Turn - key
2007
CZ,Kralupy
Intensification to ZPS on 87 kt – oxygen detection for oasts
Assembly work, revision, documentation
2007
CZ,Kralupy
Elements and switchboards exchange for operating VZT
Assembly work, revision, documentation
2007
CZ,Kralupy
New manufacturing BTD II – outlet removal MK 101
Assembly work, revision, documentation
2007
CZ,Kralupy
Air conditioning equipment for peroxide cooling – part electro
Assembly work, revision, documentation
2007
CZ,Kralupy
Energy meter for Sartomer company
Assembly work, revision, documentation
2007
CZ, Spolek pro chemickou a hutní výrobu
Combined process of production of epichlorhydrin
Turn-key
2007
Chlumec n/Cidlinou
Affiliation of installed HEFA flowmeters
D,MP,MM,fire plug, documentation
2006
CZ,Kralupy
GO light switchgear on TR 128
D.MP,revision
2006
CZ,Kralupy
ANTIDET mounting on link A, series 200
D,MP,revision, documentation
2006
CZ,Kralupy
GO - replacing of switchgear Z402B
D.MP,revision
2006
CZ,Kralupy
Repair of Extruza controlling - BHPS
D,MP,revision
2006
CZ,Kralupy
DIPB Receiption and storing
MP,D,revision
2006
CZ,Kralupy
Repairing of gear switchgears in a hall,tapping of acids and lyes
D, MP, revision
2006
CZ,Kralupy
Monitoring of Butadien abundance on SBR - SO 212 production room
Project, HW, SW, MP,D,revision
2006
CZ,Kralupy
ZPS - delivery and assembly SŘTP - PS 149a, 0515, 0517, control system, gas detection, Optic switch gear for PS 149, Weighing of chute
MP,D,revision, documentation
2006
CZ,Kralupy
Section of production lines ZPS
MP,D,revision, documentation
2006
CZ,Litvinov
EPS system
turnkey
2006
CZ,Litvinov
Polymer intesifi cation - Telecom System
turnkey
2006
CZ,Kralupy
Control system reconstruction and measuring of SKL levels
Projekt, HW, MP,D,revision
2005
CZ,Kralupy
Changing feeding pump for Tp Kaučuk
projekt, HW, SW, MP,D,revision
2005
CZ,Kralupy
Capacity enhancement of stocking SM to SKL
AS,DL,Revision
2005
CZ,Kralupy
Water pumping from tanks SKL
D,DL,AS,Revision
2005
CZ,Ústí n.L.
NMEP - PU No.12 - Intenzifi cation Granulation
turnkey ASCI,D-cable trays
2005
CZ,Ústí n.L.
NMEP - PU No.10 - Gas detection
turnkey ASCI,D-cable trays
2004
CZ,Ústí n.L.
NMEP - PU No.6 - Recovery of Epichlorhydrin
turnkey ASCI
2004
CZ,Kralupy
Control system for cooling station
DL,AS,MM,CMM
2004
CZ,Kralupy
Polypropylene
MM,AS,FI
2003
CZ,Litvinov 
Polyethylene Unit
PR,ER
2002
CZ,Kralupy
BHPS Manufacturing
D,PR,HV,FI,CS
2002
CZ,Kralupy
Vibratory Filling
D,PR,HV,FI,CS
2002
CZ,Kralupy
Plastics Laboratory
PR,HV,CS
2001
CZ,Kralupy
Utilization of circulating condensate
turnkey EL,FI,CS
2001
CZ,Kralupy
Reconstruction of Main LV Rack
PR,HV, ER
2001
CZ,Kralupy
ZPS II.phase
D,PR,ER,HV,FI,CS
2001
CZ,Kralupy
Liquid Storage
PR,ER,HV
2001
CZ,Kralupy
Styren III. - Smart
PR,ER,FI,CMM
2001
CZ,Kralupy
Dryers Repair
D,PR,ER,HV
2001
CZ,Kralupy
Dryers - Control System
D,PR,ER,EL,FI,CS
2001
CZ,Kralupy
Emergency Conditions Control
D,PR,ER,EL
2001
CZ,Kralupy
Dryers - Control System change from ABB
D
2001
CZ,Kralupy
Switching Station 6kV - power supply
PR,ER,HV
2001
CZ,Sokolov
Acrilic Acid - Compensation Distributors
turnkey HV,EL
2001
CZ,Sokolov
Acrilic Acid - Electrical Tracing
turnkey FI,CS
2001
CZ,Kralupy
ABS Production - Distributor Repair
ER
2001
CZ,Kralupy
Latex Temperation
PR,ER,FI
2001
CZ,Kralupy
Pressure Transmitters Installation
PR,ER
2001
CZ,Kralupy
Safety Lids
turnkey ER,CS
2001
CZ,Kralupy
ZPS 2nd part of Chemical Operation
turnkey EL,FI,CS
2001
CZ,Litvinov
Ethylen Unit
PR,ER
2000
CZ,Kralupy
Polystyren Production
turnkey PR,EL
2000
CZ,Kralupy
Fire Alarm System
PR,ER,CMM
2000
CZ,Kralupy
ZPS 2nd stage
turnkey EL,FI
2000
CZ,Sokolov
Vacum System
PR,ER,CMM
2000
CZ,Kralupy
Waste Water Cooling
turnkey EL,FI
2000
CZ,Kralupy
ZPS 2nd stage - drying section
D,EL,FI,CS
2000
CZ,Kralupy
Exchange of Supply Circuit
PR,ER
2000
CZ,Kralupy
Safety Items
D,PR,ER
2000
CZ,Kralupy
PSII Polystyren - reconstruction of lighting
PR,ER
2000
CZ,Sokolov
Polymerizing lines No.1-3 - reconstruction
D,ER,CMM
2000
CZ,Kralupy
City Winter Stadium - cooling change
D,PR,ER,EL,CMM
1999
CZ,Litvinov
Visbreaker Unit
D,ER
1999
CZ,Kralupy
Styren III - Steam Reduction
turnkey
1999
CZ,Kralupy
BHPS and BKPS
PR,ER,EL,FI,CS
1999
CZ,Kralupy
Model Station
PR,ER,EL,FI,CS
1999
CZ,Sokolov
Polymerizing lines No.4,5 - reconstruction
turnkey HV,FI,CS
1999
CZ,Litvinov
Dosing of Lye
PR,ER,FI,CMM
1999
CZ,Kralupy
Styren II Polymerasition Reactors
turnkey EL,FI,CS
1998
CZ,Kralupy
Crystal Polysterene
CMM
1998
CZ,Kralupy
Liquid Stock - reduction of emissions
D,ER,PR,CMM
1998
CZ,Litvinov
Heating Station-reconstruction of boilers K13,14
turnkey
1998
CZ,Kralupy
Hotwater Station
turnkey HV,FI,CS
1998
CZ,Sokolov
Polymerizing Line No.6
PR,ER,CMM
1998
CZ,Kralupy
Nitrogen Generator
PR,ER,CMM
1997
CZ,Ces.Plyn.
Unit URU
PR,ER,CMM
1997
CZ,Sokolov
Sorting of White Corundum
turnkey FI,CS
1997
CZ,Kralupy
Operation Automation for PSII
turnkey
1997
CZ,Kralupy
Tank of Block 47, Automation of Operation
PR,ER,CMM
1997
CZ,Kralupy
Izomeration
PR,ER,CMM
1996
CZ,Kralupy
Air Filtration
PR,ER,FI,CMM
1995
CZ,Kralupy
Demistation - Complete I&C
turnkey
1994
CZ,Sokolov
KAIII - Acrylic Acid Production , Complete I&C
PR,ER,FI,CMM
1994
CZ,Sokolov
Hydrogen - I&C Overhaul
PR,ER,FI,CMM
1994
CZ,Usti
Exchange Station
turnkey FI
1994
CZ,Usti Waste
Gypsum Production
PR,ER,FI,CMM
1994
CZ,Litvinov
Heating Station Reconstruction
PR,ER,FI,CMM
1994
CZ,Kralupy
ABS Object
PR,ER,FI,CMM
1993
CZ,Kralupy
Coagulation
PR,ER,FI,CMM
1992
Syria Homs
Refinery I-VI
turnkey FI,CS
1960-90
Bulgaria
Steam reforming
turnkey FI,CS
1989
Yugoslavia
Oxygen plant Kraljevo
turnkey FI,CS
1989
USSR turnkey
Gorkij-ethylen, benzin pyrolisys
turnkey FI,CS
1987
CZ,Praha
Paint manufacturing plant
turnkey FI,CS
1987
Germany
Chemical operation
turnkey FI,CS
1970-82
Iraq
Destilation Salahuddin II
turnkey FI,CS
1986
USSR
Steam reforming - 25 projects
turnkey FI,CS
1975-85
Poland
Wloclavek - nitrogen plant
turnkey FI,CS
1980
Iraq
Destilation Salahuddin I
turnkey FI,CS
1980
India
Oxygen plant Korba
turnkey FI,CS
1975
Iraq
Basra II Rafinery
turnkey FI,CS
1975
USSR
Keremevo - polyamid manufacturing
turnkey FI,CS
1975
Germany
Urea manufacturing Piesteritz
turnkey FI,CS
1974
Yugoslavia
Oxygen plants -Lukavec, Smeredevo
turnkey FI,CS
1970
 
 
 
 
Abbreviations used:


AS        - Assembly
ASCI    - Autom.systems for technol.process control (CS+field instrumentation)
build.   - building part
CS        - Control System
CMM     - Commissioning
COM     - Communication
D          - Basic and/or Detailed Design
DL        - Delivery
ER        - Erection
EL        - Electrical System
electro - Electro part HV,LV
el.HV    - High voltage el.part
el.LV    - Low voltage el.part
FI         - Field Instrumentation
HV        - HV Electrical Part
M         - Manufacturing
MM       - Mounting material
M&R     - Measurment and regulation
PR        - Procurement
SC        - SCADA System
SW       - User progr.SW
turnkey - Complete project



Personal tools