Spolek pro chem. a hutní výrobu, a.s.
|
Service and regular maintenance - holding a permanent emergency services
|
FI, SW, HW
|
2007-10
|
|
Synthos KRALUPY, a.s.
|
Delivery, installation and commissioning of the EPS service for NI: Production XPS panels
|
Assembly,delivery MM and switchboard, documentation
|
2009
|
|
Synthos KRALUPY, a.s.
|
Increased security of SKP - Stage III of instrumentation
|
Assembly,delivery MM and switchboard, documentation
|
2009
|
|
Synthos KRALUPY, a.s.
|
Delivery, installation and commissioning of mearusements for NI: production XPS panels
|
Assembly,delivery MM and switchboard, documentation
|
2009
|
|
Synthos KRALUPY, a.s.
|
Supply and installation of electro PS0518, PS148, PS002 - Production XPS panels
|
Assembly,delivery MM and switchboard, documentation
|
2009
|
|
Spolek pro chem. a hutní výrobu, a.s.
|
Modifying the power steering and regul. Systems - Liquid Chlorine
|
CS
|
2008
|
|
Spolek pro chem. a hutní výrobu, a.s.
|
Increasing of granary 23 TK D01
|
Delivery, assembly work
|
2008
|
|
ČR,Kralupy
|
Flow measurement still fluid ETB
|
Delivery, assembly work, revision
|
2008
|
|
ČR,Kralupy
|
Improving safety of SKP
|
Delivery, assembly work, revision
|
2008
|
|
Spolek pro chem. a hutní výrobu, a.s.
|
Recovery of production HCl
|
Turn - key
|
2008
|
|
CZ,Kralupy
|
Analyzer of measurement of particle size ZPS
|
Assembly work, revision, documentation
|
2008
|
|
CZ,Kralupy
|
General repair of the main motor switch board Rm 042.1 and RO 042.1
|
Assembly work, revision, documentation
|
2007
|
|
CZ,Kralupy
|
Reconstruction of heat control room Z EN
|
Assembly work, revision, documentation
|
2007
|
|
CZ,Kralupy
|
Delivery and installation of ASCI – part of series 100 and 600
|
Assembly work, revision, documentation
|
2007
|
|
Epispol, a.s.
|
NMEP II – PS 03
|
Turn - key
|
2007
|
|
CZ, Spolek pro chemickou a hutní výrobu
|
Safety increasing of operation of chlorine chemistry – control system
|
Turn - key
|
2007
|
|
CZ,Kralupy
|
Intensification to ZPS on 87 kt – oxygen detection for oasts
|
Assembly work, revision, documentation
|
2007
|
|
CZ,Kralupy
|
Elements and switchboards exchange for operating VZT
|
Assembly work, revision, documentation
|
2007
|
|
CZ,Kralupy
|
New manufacturing BTD II – outlet removal MK 101
|
Assembly work, revision, documentation
|
2007
|
|
CZ,Kralupy
|
Air conditioning equipment for peroxide cooling – part electro
|
Assembly work, revision, documentation
|
2007
|
|
CZ,Kralupy
|
Energy meter for Sartomer company
|
Assembly work, revision, documentation
|
2007
|
|
CZ, Spolek pro chemickou a hutní výrobu
|
Combined process of production of epichlorhydrin
|
Turn-key
|
2007
|
|
Chlumec n/Cidlinou
|
Affiliation of installed HEFA flowmeters
|
D,MP,MM,fire plug, documentation
|
2006
|
|
CZ,Kralupy
|
GO light switchgear on TR 128
|
D.MP,revision
|
2006
|
|
CZ,Kralupy
|
ANTIDET mounting on link A, series 200
|
D,MP,revision, documentation
|
2006
|
|
CZ,Kralupy
|
GO - replacing of switchgear Z402B
|
D.MP,revision
|
2006
|
|
CZ,Kralupy
|
Repair of Extruza controlling - BHPS
|
D,MP,revision
|
2006
|
|
CZ,Kralupy
|
DIPB Receiption and storing
|
MP,D,revision
|
2006
|
|
CZ,Kralupy
|
Repairing of gear switchgears in a hall,tapping of acids and lyes
|
D, MP, revision
|
2006
|
|
CZ,Kralupy
|
Monitoring of Butadien abundance on SBR - SO 212 production room
|
Project, HW, SW, MP,D,revision
|
2006
|
|
CZ,Kralupy
|
ZPS - delivery and assembly SŘTP - PS 149a, 0515, 0517, control system, gas detection, Optic switch gear for PS 149, Weighing of chute
|
MP,D,revision, documentation
|
2006
|
|
CZ,Kralupy
|
Section of production lines ZPS
|
MP,D,revision, documentation
|
2006
|
|
CZ,Litvinov
|
EPS system
|
turnkey
|
2006
|
|
CZ,Litvinov
|
Polymer intesifi cation - Telecom System
|
turnkey
|
2006
|
|
CZ,Kralupy
|
Control system reconstruction and measuring of SKL levels
|
Projekt, HW, MP,D,revision
|
2005
|
|
CZ,Kralupy
|
Changing feeding pump for Tp Kaučuk
|
projekt, HW, SW, MP,D,revision
|
2005
|
|
CZ,Kralupy
|
Capacity enhancement of stocking SM to SKL
|
AS,DL,Revision
|
2005
|
|
CZ,Kralupy
|
Water pumping from tanks SKL
|
D,DL,AS,Revision
|
2005
|
|
CZ,Ústí n.L.
|
NMEP - PU No.12 - Intenzifi cation Granulation
|
turnkey ASCI,D-cable trays
|
2005
|
|
CZ,Ústí n.L.
|
NMEP - PU No.10 - Gas detection
|
turnkey ASCI,D-cable trays
|
2004
|
|
CZ,Ústí n.L.
|
NMEP - PU No.6 - Recovery of Epichlorhydrin
|
turnkey ASCI
|
2004
|
|
CZ,Kralupy
|
Control system for cooling station
|
DL,AS,MM,CMM
|
2004
|
|
CZ,Kralupy
|
Polypropylene
|
MM,AS,FI
|
2003
|
|
CZ,Litvinov
|
Polyethylene Unit
|
PR,ER
|
2002
|
|
CZ,Kralupy
|
BHPS Manufacturing
|
D,PR,HV,FI,CS
|
2002
|
|
CZ,Kralupy
|
Vibratory Filling
|
D,PR,HV,FI,CS
|
2002
|
|
CZ,Kralupy
|
Plastics Laboratory
|
PR,HV,CS
|
2001
|
|
CZ,Kralupy
|
Utilization of circulating condensate
|
turnkey EL,FI,CS
|
2001
|
|
CZ,Kralupy
|
Reconstruction of Main LV Rack
|
PR,HV, ER
|
2001
|
|
CZ,Kralupy
|
ZPS II.phase
|
D,PR,ER,HV,FI,CS
|
2001
|
|
CZ,Kralupy
|
Liquid Storage
|
PR,ER,HV
|
2001
|
|
CZ,Kralupy
|
Styren III. - Smart
|
PR,ER,FI,CMM
|
2001
|
|
CZ,Kralupy
|
Dryers Repair
|
D,PR,ER,HV
|
2001
|
|
CZ,Kralupy
|
Dryers - Control System
|
D,PR,ER,EL,FI,CS
|
2001
|
|
CZ,Kralupy
|
Emergency Conditions Control
|
D,PR,ER,EL
|
2001
|
|
CZ,Kralupy
|
Dryers - Control System change from ABB
|
D
|
2001
|
|
CZ,Kralupy
|
Switching Station 6kV - power supply
|
PR,ER,HV
|
2001
|
|
CZ,Sokolov
|
Acrilic Acid - Compensation Distributors
|
turnkey HV,EL
|
2001
|
|
CZ,Sokolov
|
Acrilic Acid - Electrical Tracing
|
turnkey FI,CS
|
2001
|
|
CZ,Kralupy
|
ABS Production - Distributor Repair
|
ER
|
2001
|
|
CZ,Kralupy
|
Latex Temperation
|
PR,ER,FI
|
2001
|
|
CZ,Kralupy
|
Pressure Transmitters Installation
|
PR,ER
|
2001
|
|
CZ,Kralupy
|
Safety Lids
|
turnkey ER,CS
|
2001
|
|
CZ,Kralupy
|
ZPS 2nd part of Chemical Operation
|
turnkey EL,FI,CS
|
2001
|
|
CZ,Litvinov
|
Ethylen Unit
|
PR,ER
|
2000
|
|
CZ,Kralupy
|
Polystyren Production
|
turnkey PR,EL
|
2000
|
|
CZ,Kralupy
|
Fire Alarm System
|
PR,ER,CMM
|
2000
|
|
CZ,Kralupy
|
ZPS 2nd stage
|
turnkey EL,FI
|
2000
|
|
CZ,Sokolov
|
Vacum System
|
PR,ER,CMM
|
2000
|
|
CZ,Kralupy
|
Waste Water Cooling
|
turnkey EL,FI
|
2000
|
|
CZ,Kralupy
|
ZPS 2nd stage - drying section
|
D,EL,FI,CS
|
2000
|
|
CZ,Kralupy
|
Exchange of Supply Circuit
|
PR,ER
|
2000
|
|
CZ,Kralupy
|
Safety Items
|
D,PR,ER
|
2000
|
|
CZ,Kralupy
|
PSII Polystyren - reconstruction of lighting
|
PR,ER
|
2000
|
|
CZ,Sokolov
|
Polymerizing lines No.1-3 - reconstruction
|
D,ER,CMM
|
2000
|
|
CZ,Kralupy
|
City Winter Stadium - cooling change
|
D,PR,ER,EL,CMM
|
1999
|
|
CZ,Litvinov
|
Visbreaker Unit
|
D,ER
|
1999
|
|
CZ,Kralupy
|
Styren III - Steam Reduction
|
turnkey
|
1999
|
|
CZ,Kralupy
|
BHPS and BKPS
|
PR,ER,EL,FI,CS
|
1999
|
|
CZ,Kralupy
|
Model Station
|
PR,ER,EL,FI,CS
|
1999
|
|
CZ,Sokolov
|
Polymerizing lines No.4,5 - reconstruction
|
turnkey HV,FI,CS
|
1999
|
|
CZ,Litvinov
|
Dosing of Lye
|
PR,ER,FI,CMM
|
1999
|
|
CZ,Kralupy
|
Styren II Polymerasition Reactors
|
turnkey EL,FI,CS
|
1998
|
|
CZ,Kralupy
|
Crystal Polysterene
|
CMM
|
1998
|
|
CZ,Kralupy
|
Liquid Stock - reduction of emissions
|
D,ER,PR,CMM
|
1998
|
|
CZ,Litvinov
|
Heating Station-reconstruction of boilers K13,14
|
turnkey
|
1998
|
|
CZ,Kralupy
|
Hotwater Station
|
turnkey HV,FI,CS
|
1998
|
|
CZ,Sokolov
|
Polymerizing Line No.6
|
PR,ER,CMM
|
1998
|
|
CZ,Kralupy
|
Nitrogen Generator
|
PR,ER,CMM
|
1997
|
|
CZ,Ces.Plyn.
|
Unit URU
|
PR,ER,CMM
|
1997
|
|
CZ,Sokolov
|
Sorting of White Corundum
|
turnkey FI,CS
|
1997
|
|
CZ,Kralupy
|
Operation Automation for PSII
|
turnkey
|
1997
|
|
CZ,Kralupy
|
Tank of Block 47, Automation of Operation
|
PR,ER,CMM
|
1997
|
|
CZ,Kralupy
|
Izomeration
|
PR,ER,CMM
|
1996
|
|
CZ,Kralupy
|
Air Filtration
|
PR,ER,FI,CMM
|
1995
|
|
CZ,Kralupy
|
Demistation - Complete I&C
|
turnkey
|
1994
|
|
CZ,Sokolov
|
KAIII - Acrylic Acid Production , Complete I&C
|
PR,ER,FI,CMM
|
1994
|
|
CZ,Sokolov
|
Hydrogen - I&C Overhaul
|
PR,ER,FI,CMM
|
1994
|
|
CZ,Usti
|
Exchange Station
|
turnkey FI
|
1994
|
|
CZ,Usti Waste
|
Gypsum Production
|
PR,ER,FI,CMM
|
1994
|
|
CZ,Litvinov
|
Heating Station Reconstruction
|
PR,ER,FI,CMM
|
1994
|
|
CZ,Kralupy
|
ABS Object
|
PR,ER,FI,CMM
|
1993
|
|
CZ,Kralupy
|
Coagulation
|
PR,ER,FI,CMM
|
1992
|
|
Syria Homs
|
Refinery I-VI
|
turnkey FI,CS
|
1960-90
|
|
Bulgaria
|
Steam reforming
|
turnkey FI,CS
|
1989
|
|
Yugoslavia
|
Oxygen plant Kraljevo
|
turnkey FI,CS
|
1989
|
|
USSR turnkey
|
Gorkij-ethylen, benzin pyrolisys
|
turnkey FI,CS
|
1987
|
|
CZ,Praha
|
Paint manufacturing plant
|
turnkey FI,CS
|
1987
|
|
Germany
|
Chemical operation
|
turnkey FI,CS
|
1970-82
|
|
Iraq
|
Destilation Salahuddin II
|
turnkey FI,CS
|
1986
|
|
USSR
|
Steam reforming - 25 projects
|
turnkey FI,CS
|
1975-85
|
|
Poland
|
Wloclavek - nitrogen plant
|
turnkey FI,CS
|
1980
|
|
Iraq
|
Destilation Salahuddin I
|
turnkey FI,CS
|
1980
|
|
India
|
Oxygen plant Korba
|
turnkey FI,CS
|
1975
|
|
Iraq
|
Basra II Rafinery
|
turnkey FI,CS
|
1975
|
|
USSR
|
Keremevo - polyamid manufacturing
|
turnkey FI,CS
|
1975
|
|
Germany
|
Urea manufacturing Piesteritz
|
turnkey FI,CS
|
1974
|
|
Yugoslavia
|
Oxygen plants -Lukavec, Smeredevo
|
turnkey FI,CS
|
1970
|
Abbreviations used:
AS - Assembly
ASCI - Autom.systems for technol.process control (CS+field instrumentation)
build. - building part
CS - Control System
CMM - Commissioning
COM - Communication
D - Basic and/or Detailed Design
DL - Delivery
ER - Erection
EL - Electrical System
electro - Electro part HV,LV
el.HV - High voltage el.part
el.LV - Low voltage el.part
FI - Field Instrumentation
HV - HV Electrical Part
M - Manufacturing
MM - Mounting material
M&R - Measurment and regulation
PR - Procurement
SC - SCADA System
SW - User progr.SW
turnkey - Complete project